Thursday, August 2, 2007
Last gasps of summer
Just when I thought visitors were all gone, we had one last unexpected set on Sunday. Alberto went to pick up his cousin and aunt who flew into to Tijuana coming home from Culiacan and on their way back to the Bay Area where they live. There is no direct flight to San Jose from anywhere in Mexico, so Alberto volunteered to pick them up at the TJ airport and take them to the SD airport, where they’d get another flight. Well, the border wait was so long they missed their connecting flight in San Diego and presto! We had more house guests for a night.
Not that I am complaining – I’m just tired :) It’s a lot of work to have houseguests for a month!
Kitchen Update
If you thought it was done, you thought wrong. We have been stuck on a cabinets in but no floor or countertop phase for several weeks now. Well, we finally got someone to call us back about the countertop – can you believe they’re not coming out until August 6? What craziness. I originally called and started this whole process on July 2.
For the floor, Alberto is starting to lay the rest of the tile on the floor in the downstairs, after jackhammering all the old tile up on Saturday. He's is about halfway through the kitchen and trying to get it done before the weekend. He's going to have a lot of work to do, because he is just laying the tile, not grouting or sealing yet. I don't know how he can do this work everyday...it's too hard for me to even watch.
Backyard Update
The flowers in the back are doing about 50/50 – half are looking really good, and half are not faring so well. It’s the hottest time of the year here, so maybe that has something to do with it. We are continuing to water every morning and night on the same schedule, and I am trying to give them love and a little miracle gro. Cross your fingers that they’ll make it!
We had a guy literally show up at our house who could cut down trees on Monday. What luck! Our neighbors (the nice ones) decided to cut down their pine tree and so halfway through him cutting it down (he was up in the tree so he was overlooking my yard), I came out and inquired about what he was doing. His name was Panapa. That's all I know about him. He told me he was cutting down my neighbor's tree and asked if I needed any trees cut down too. Woo hoo! Perfect timing. I had just been talking to Dalilah (Alberto's cousin) about it the day before. I got him to do both the slanting tree and the stump coming up and straight to the back for one low price. It’s amazing how much space there is now in the yard. It’s really transformed. Time to get to work on that area too!
Other items
Alberto has decided that the sickness Stephanie and I had was because of the sun. This is because I got sick again for a few days, and I had happened to work in the sun for a while right before. Dulce, one of our nieces that worked with me, got sick too. Not the bad stomach part, just the ‘skin fever’. So he has decided that it is because of the sun and I am too fragile to work outside. I can’t be out there more than an hour or so before he starts getting after me to go indoors. As a result, I still haven’t put mulch down that I bought, and the hill is getting overrun with weeds again. Drat! Never enough time…
Monday, July 30, 2007
Von Bodungen Visit, week 2
Steph and I spent the next few days sick as dogs
With Mark back in New Orleans and Alberto back to work, Stephanie and I set ourselves about painting the kitchen and planting flowers in the back yard.
The boys had done the perimeter work with the trees and the bougainvillea, and it was time for us to fill in the middle.
Last stop before Steph went home was Balboa Park. We took Dudley with us too on his first real afternoon excursion. Dudley loved it, but we wore him out!
Then it was back to New Orleans and the real world! Well, almost at least. I still had a few more days before I started my new job :)
N
Wednesday, July 4, 2007
kitchen problems
There is going to be a *big* delay for the granite countertop. The company that is going to do the work can't come out to even template it until Monday....and the actual installation looks like it's going to be somewhere around the last week of July. As in, almost 1 month from now!
We're supposed to wait to install the sink/faucet and the stove until the counter has been installed, which means I have a non-functional kitchen for a very long time.
The company was completely unapologetic about such a long delay and could only say "that's how these things go"....small consolation to us since we've been without cooking appliances for a week and have eaten nothing but shit the whole time.
There is *no way* we are going to be able to go for a month without a kitchen....so I have set Alberto to work on getting the faucet installed through the plywood, and the stove hooked up. We'll just have to undo when they get around to doing the work they were hired to do!
Other small problems:
the hose on the oven doesn't fit the attachment in the wall
the ring on the disposal doesn't fit the new sink
the vent hood didn't have the lights in the box it was supposed to
all small things, of course...but discovering them back-to-back-to-back in the span of an hour makes for a stressful morning :P
Here's the biggest small problem - the refrigerator is too wide for the cabinetry! I don't know how this got overlooked or if our refrigerator is just bigger than normal or what, but the unit juts out quite a lot from the front of the cabinet housing that was installed:
See how it's crooked too? That's because Alberto laid tile inside of the housing prior to putting the fridge back in, and so now it's more elevated in the back than in the front.
Remodeling is fun...
Sunday, July 1, 2007
Kitchen remodel, Part I
Day 1
Then we realized that it's what we've been looking at all along.
These cabinets, which are original to the house, had no backs. The walls were spray painted a dark brown to match the color of the cabinets.
Oh, the early eighties.....
It was difficult to take out the sink, so Alberto just took a little axe to it and split the wood enough to pull it down and out!
We also found that the cabinets were *beneath* the tile that had been laid at some point.
By the end of Friday night, we had ripped out the bottom cabinets and pulled out the oven, vent hood and dishwasher, but the top cabinets were still left to be pulled.
Jose was coming at 7 am the next morning to get started, so Alberto decided he'd pull out the top cabinets while Jose was installing the bottom ones.
Day 2
And that's exactly what we did!
The next morning, Jose was here at 7 am on the dot, and they went to town.
This guy is definitely experienced with all of this work, he had the cabinets out of their boxes and in position before I even made it down the stairs to brew some coffee.
And so it went, ripping out top cabinets, installing bottom cabinets, and then getting started on the top cabinetry about halfway through the day.
Of course, Dudley had to be where the action was, and decided to supervise from the cozy little spot that he found in between the new cabinets, where the new oven will eventually go -
By the end of the day, we had all the cabinets hung except for the microwave insert and the wine buffet, and we also had to put all the trim and moulding around the tops and bottoms.
Day 3We started again at 7 am Sunday morning (today), and wasted no time.
Today, all the trim and moulding has been placed, the glass inserts and cabinet shelves have been installed, and the arch valance has been installed above the sink.
Also, the wine buffet is up and it's looking great!
They also installed the new stainless steel sink and in the plywood. We will have someone out this week to template for the granite countertop and hopefully have that in soon after.
Here's Jose, the guy who's working with us. He is very friendly, very professional, and a very fast worker! If you are in the SoCal area and needs your cabinets put up, this is your man.
We just finished our day.
We have everything done except the oven and dishwasher installation, placing the refrigerator in its new 'housing', and the plumbing for the sink. We also need to put all the handles on the doors. Once the granite counter is in place, Alberto will make the custom backsplash he is planning for me.
After that we'll paint a couple of walls, hang a couple of nice lights, and we'll have a brand new kitchen!
*hanging pictures
*touching up paint everywhere
*pruning the peach tree
*prepping the spa for Stephanie's arrival (in 3 days!)
*getting all my flower beds back in shape
*pulling weeds out of the grass and
*reorganizing the master bathroom.
I am too, but I don't think it's the same kind of exhausted. :P
I'll post another blog when it's all done so you can see the finished product!
Wednesday, June 27, 2007
Emptying the kitchen
I'm doing this because we are on the verge of remodeling our kitchen now! What a long twisty road that has been, with designing the kitchen "of my dreams" with the guy from Home Depot to packing our garage with all the cabinetry, to picking out what countertop to order, to ordering appliances, to the minutiae to the nth degree about everything and everything else. And we still have to buy the vent hood, the sink, the faucet and fixtures, the lighting....I'm exhausted, and we haven't even demo'ed the first cabinet yet!
I am looking forward to my new kitchen though. With any luck, it will be completely done by the end of July and I'll be able to post some beautiful photos. Crossing my fingers........